* Split TestPullRequest out of AddTestPullRequestTask
* A Created field is added to the Issue table
* The Created field is set to the time (with nano resolution) on creation
* Record the nano time repo_module.PushUpdateOptions is created by the hook
* The decision to update a pull request created before a commit was
pushed is based on the time (with nano resolution) the git hook
was run and the Created field
It ensures the following happens:
* commit C is pushed
* the git hook queues AddTestPullRequestTask for processing and returns with success
* TestPullRequest is not called yet
* a pull request P with commit C as the head is created
* TestPullRequest runs and ignores P because it was created after the commit was received
When the "created" column is NULL, no verification is done, pull
requests that were created before the column was created in the
database cannot be newer than the latest call to a git hook.
Fixes: https://codeberg.org/forgejo/forgejo/issues/2009
The fix against the race incorrectly assumes the sha of the commit being
pushed belongs to the base repository. It finds the highest possible
pull request ID from the head repository instead of looking it up in
the base repository.
Figuring out if a PR was created in the future based on the highest
index of the base repository would require collecting all of them
because there is no way to know in advance which repository may be
involved in the race.
Fixing this race can be done either by:
* Introducing a new field in the pull_request table https://codeberg.org/forgejo/forgejo/pulls/2842
which feels more like a hack than a real solution
* Refactoring the logic
which would be a significant undertaking
The race has been in the codebase for a very long time and manifests
itself in the CI, when events happen in quick succession. The only
concrete manifestation was however fixed by https://codeberg.org/forgejo/forgejo/issues/2009
Since this race now only exists in theory and not in practice, let's
revert this bugous commit until a proper solution is implemented.
Fixes: https://codeberg.org/forgejo/forgejo/issues/2817
This reverts commit 036f1eddc5.
Conflicts:
services/pull/pull.go
* Split TestPullRequest out of AddTestPullRequestTask
* Before scheduling the task, AddTestPullRequestTask stores the max
index of the repository
* When the task runs, it does not take into account pull requests that
have an index higher than the recorded max index
When AddTestPullRequestTask is called with isSync == true, it is the
direct consequence of a new commit being pushed. Forgejo knows nothing
of this new commit yet. If a PR is created later and its head
references the new commit, it will have an index that is higher and
must not be taken into account. It would be acting and triggering a
notification for a PR based on an event that happened before it
existed.
Refs: https://codeberg.org/forgejo/forgejo/issues/2009
Reviewed-on: https://codeberg.org/forgejo/forgejo/pulls/2236
Reviewed-by: Gusted <gusted@noreply.codeberg.org>
Co-authored-by: Earl Warren <contact@earl-warren.org>
Co-committed-by: Earl Warren <contact@earl-warren.org>
(cherry picked from commit b3be895a30b32bfae4acfa32db54406e1dd1dc21)